an NSf S-STeM scholar in geology. She was followed by our State and County

elected officials, who all delivered congratulatory remarks. Legislator Tom Barraga also

enthusiastically advocated for everyone to consider changing the College from a two-

year institution to a four-year college. e crowd was delighted with his suggestion,

which echoes a wish we hear frequently expressed by our students and alumni.

During the groundbreaking ceremony for the new Health and wellness Center

proposed for our eastern Campus, greetings from the Board were delivered by Trustee

Gordon Canary. e program portion of the event was held inside, with guests

moving outdoors for photos that were taken afterwards. College Mascot finn made

one of his first official appearances at this event. following the program, the audience

joined us for refreshments that were prepared by our Culinary Arts students.

Substantial local press coverage resulted from the groundbreaking, including articles

in the area weeklies and online media.

Construction is well underway on our new Learning resource Center at the

Michael J. Grant Campus. is year, completion of the foundation was followed by

the installation of structural steel. we anticipate that the new building will be

completed by the summer of 2017.

As part of our partnership with Long island University, i am pleased to share with

you that we will be opening the new LiU modular building on the Michael J. Grant

Campus in time for the fall 2016 semester. e College has received a Certificate of

occupancy for the LiU Building. is building will be scheduled to accommodate

use by Suffolk students during the day and early afternoon and by LiU students

during the late afternoon and the evening. is building was constructed via a creative

public-private partnership between our two institutions and we are proud to share

some of our campus space with LiU.

Similarly, the College has received a permanent Certificate of occupancy for the

william J. Lindsay Life Sciences Building.

eight design proposals were received for the construction of a new Plant operations

building on the Michael J. Grant Campus. is facility will allow the College to

consolidate and relocate plant operations for that campus to one central location.

e current space for these offices was constructed in the 1930s and has not been

upgraded since the campus was established in the early

1970s.we

anticipate selecting

the architect for this project sometime in the early fall.

Design funds were appropriated and a location was identified for construction of a

new warehouse Building for the eastern Campus. Completion of this project is

being undertaken to address the campus’s need for receiving and warehouse space.

we anticipate that a design contract will be awarded before the end of the 2016

calendar year.

e anti-bird strike film that was installed on a pilot basis on the windows at the

Montaukett Learning resource Center has been deemed effective and a full order of

the film is currently being installed. e design of a quiet room HvAC system was

also completed for the building and construction is underway.

e committee charged with leading the effort to renovate the Sagtikos Building on

the Michael J. Grant Campus has been meeting to prepare the rfP. Conceptually, the

new building will be reconfigured to create a top-level center for teaching arts courses.

25

❘

2015-2016 Review of Accomplishments

e Eastern Campus will be home to the forthcoming

Health and Wellness Center.

e new Learning Resource Center at the Michael J. Grant Campus

should be nearing completion next summer.